Process — Phase 03 Est. 2010

Build
& Handover

Meticulous scheduling, on-site quality control, and a closing walk designed to exceed day-one expectations — not meet them.

01Weekly Client Updates02On-Site QA Reviews03Final Punch & Walk042-Year Warranty
6–12Months
WeeklyUpdates
2-YrWarranty
01 — Phase 03 · 6–12 months

Built on site,
run like a studio.

Weekly on-site check-ins, a single point of contact, and a project dashboard with photos, progress, and upcoming decisions. The final walk happens only when the punch list is at zero — and a two-year warranty follows you home.

02 — The Steps Phase 03 of 03
03.1

Weekly Client Updates

Weekly on-site check-ins with a single point of contact, plus a dedicated project dashboard with photos, progress, and the decisions coming up next.

Every week
03.2

On-Site QA Reviews

On-site quality control throughout the build — every detail specified by us and executed by our long-standing trade partners, to the same standard on every project.

Owner-led
03.3

Final Punch & Walk

The closing walk is designed to exceed day-one expectations, not meet them — and it only happens when the punch list is at zero.

Punch at zero
03.4

2-Year Warranty

Handover isn't the end of the relationship. Every Richardson project carries a two-year warranty, backed by the studio that built it.

2 years
Covered outdoor patio at 3751 Highway 319
03 — The Outcome

You leave with
the keys.

A finished home, a punch list at zero, a two-year warranty — and a builder you can still call. That's what handover means at Richardson.

Start a Project Full Process